Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 6 results ...

Asiedu, R O, Adaku, E and Owusu-Manu, D-G (2017) Beyond the causes: Rethinking mitigating measures to avert cost and time overruns in construction projects. Construction Innovation, 17(03), 363-80.

Aziz, Z, Qasim, R M and Wajdi, S (2017) Improving productivity of road surfacing operations using value stream mapping and discrete event simulation. Construction Innovation, 17(03), 294-323.

Hietajärvi, A-M, Aaltonen, K and Haapasalo, H (2017) Opportunity management in large projects: A case study of an infrastructure alliance project. Construction Innovation, 17(03), 340-62.

Jonsson, H and Rudberg, M (2017) KPIs for measuring performance of production systems for residential building: A production strategy perspective. Construction Innovation, 17(03), 381-403.

Sackey, E and Akotia, J (2017) Spanning the multilevel boundaries of construction organisations: Towards the delivery of BIM-compliant projects. Construction Innovation, 17(03), 273-93.

Zaeri, F, Rotimi, J O B, Hosseini, M R and Cox, J (2017) Implementation of the LPS using an excel spreadsheet: A case study from the New Zealand construction industry. Construction Innovation, 17(03), 324-39.

  • Type: Journal Article
  • Keywords: challenges,construction management,spreadsheet,automation,last planner system,percent plan complete
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/CI-01-2016-0002
  • Abstract:
    An investigation of the implementation challenges of the last planner system (LPS) in the New Zealand construction sector reveals that the LPS uses an Excel spreadsheet for obtaining several automation solutions to overcome data utilisation challenges.